ENGINEERING SERVICES
In 2015 Cavan Leisure centre contacted Filtrex with a view to converting there pellet boiler and store and boiler to be able to burn wood chips. Due to the restrictive space available a material handling fan, auger and tough system was designed to allow the fuel store to be filled.
The system involves a trailer to tip the wood chips into a free standing trough, an auger conveys the wood chip along the trough to the fan which draws the wood chip in and blows vertically up through a pipe before ejecting the wood into the fuel store. A stop/start control systems regulates the feed rate of the feed auger so that it is matched to rate of material removal of the fan.
BETTER ENGINEERING
As part of a project to dry wood chip Filtrex was charged with designing a system that could fill a small drying store and then transport the fuel to two fuel stores or a waiting trailer for transportation onwards. A trough and auger system was installed to fill the drying store, this received wood chip into a hopper transferring the wood chip vertically and then horizontally.
The horizontal auger transferred the wood chip into the store and acted at a fuel levelling system to ensure the store was full to capacity.
At the other end of the drying store the wood chip was emptied the in a conveyor which transferred the wood chip into the first of two fuel stores. The filling of these stores was controlled by two sluice gates, once each store was full the sluice gates automatically close and the fuel moves on to the new store.
Any excess fuel can transferred through the second fuel store to a levelling auger which fills and levels the waiting trailer. The system is designed to be automatic, and allows the dying process to operate without operator.