Details specific to this engineering project
Herz Firematic 150kW
Twin Wall Stainless Steel Flue
2000l fully insulated hot water buffer tank.
Ben O’Sullivan of the Deebert House Hotel contacted Filtrex with a view to installing a biomass boiler as the primary heating system in the new hotel. At the first planning meeting the hotel management team indicated that they were willing to invest the extra capital in the biomass boiler provided that it met the following criteria:
Filtrex were able to meet and exceed all these requirements by using a Herz Firematic 150kW in conjunction with a 2000l fully insulated hot water buffer tank.
The Herz Firematic is particularly suitable for small commercial installations with intermittent peak loads such as small hotels.
Project Specifics
Design, installation and commissioning of biomass heating plant capable of generating 150kW of thermal energy fuelled by wood pellets.
The final installation consisted of:
“We took great comfort in Filtrex’s technical ability, which was clearly evident from the start of the project. From the project concept right through to commissioning and handover, the service was what you would expect from a professional engineering company”
Ben O’Sullivan, Proprietor Deebert House Hotel
PROJECT ELEMENTS
Core services provided from Filtrex on this engineering project.